Chuck's Condo
Here are some pictures of my new condo. After waiting more than 8 months
for construction to complete, I move the second week of August.

north side of the building (I'm on the 10th floor in the middle)

east side of the building

southeast side of the building from the Broadway Bridge

southeast side of the building from the Broadway Bridge

southwest side of the building

main lobby

mailboxes above the main lobby

10th floor elevator lobby

10th floor hallway

looking into my condo (den to the right)

den (probably will use as a dining room)

looking back at the entry
(kitchen to the left, bathroom and bedroom to the right)

kitchen (might remodel with a bar of some sort)

bedroom

bathroom

floorplan

180 degree view looking north from my condo
Back to my home page